When the Ladies College broke up for Christmas we were under pressure to complete all of the work for this 480m2 Car park before their return! It was not a good start as it rained constantly for 2 weeks however we managed to battle through and get finished on time. The contractor was Ace of Spades. Please click on the photos on the right to view a slideshow –>
(Commenting: OFF)

The advertising at Cobo Butchery has recently been refreshed. We would like to thank Chloe Sarre from St Sampson’s High School who did the initial design concepts during her work experience with Enrapture as part of an outdoor advertising task.
(Commenting: OFF)

Our new driver! 7 month old Lottie would like to wish old and new customers a very Happy Christmas. Love Lottie
(Commenting: OFF)

Flexi Solutions sponsors the The Saints Ladies Football team and they had a great season winning 3 trophies – the league, the knock out cup and the charity shield. Well done ladies!
(Commenting: OFF)

We recently supplied and installed a bespoke gate for a client. Contact us to discuss your gate requirements.
(Commenting: OFF)

Project at a glance

Application

To create a hardstanding surface for heavy goods vehicles for a new light industrial distribution warehouse covering 3330square metres.

Location

The Garden & Leisure Store, Landes du Marche, Vale, Guernsey

Installation Date

June 2011

Client

Stan Brouard Ltd.

Groundworks

David Lesbirel – Guernsey

Installers

BW Builders – Guernsey

The Challenge

To create a hard wearing surface which would withstand constant heavy use by HGVs, forklifts, etc.

The Solution

Installation of Gridforce GF40 filled with aggregate on top of a geotextile membrane and levelling layer of dust with a sub base of 400mm of crushed stone. Although there are many options such as tarmac, concrete and paving, none of these are as effective as Gridforce. There are many advantages to using Gridforce, it has a load bearing capacity of up to 400 tonnes per square metre and is made from 100% recycled low density plastic – which means a greater flexibility enabling it to move without cracking and to withstand extreme temperatures (-30 upto 85°C). Where Gridforce really stands out is its filtration system, surface water immediately drains back into the water table, which eliminates the need for pipe work.
(Commenting: OFF)

An overflow car park with 22 spaces was required and The Department of Transport’s preference was for the area to still look like grass, but be reinforced for vehicle usage.
(Commenting: OFF)

Ross-on-Wye Golf Club were experiencing drainage problems in several locations on their course. Greens and fairways had saturated areas caused by a combination of the increasing rainfall and the reduced drainage capacity of the clay-based subsoil. The course was unplayable, forcing temporary closure which impacted on club revenue and members’ satisfaction.
(Commenting: OFF)