An overflow car park with 22 spaces was required and The Department of Transport’s preference was for the area to still look like grass, but be reinforced for vehicle usage.
(Commenting: OFF)

Ross-on-Wye Golf Club were experiencing drainage problems in several locations on their course. Greens and fairways had saturated areas caused by a combination of the increasing rainfall and the reduced drainage capacity of the clay-based subsoil. The course was unplayable, forcing temporary closure which impacted on club revenue and members’ satisfaction.
(Commenting: OFF)

High costs for excavation were expected, and site access for multiple deliveries posed problems. The original proposed soakaway was designed to be 65m long, 2.1m deep and 1.8m wide to accommodate the required drainage for this particular location.
(Commenting: OFF)

If you are reading this news item- welcome to Flexi Solutions new website. Please take a look around and please give us feedback on our contacts page.

We hope you find what you are looking for, but if not give us a call.

(Commenting: OFF)